Requirements for installation of hardwood flooring and under-floor heating

  The building should be enclosed and all wet trades completed. The sub-floor should be installed at similar moisture conditions to the floor. This means 6-8% moisture for timber substrates and less than 75% Relative Humidity (RH) for screeds. The under-floor heating system...
By :
Comments : Off